Job Site Requirements

Electricity must be available at the job site at the time of installation or prior arrangements should be made.
Check with your local city government to see if a building permit is required for your area.
A minimum 2′ clearance should be allowed above and around all sides of the selected building location for proper installation.
Prices do not include excavating, old shed removal, or any tree and shrub trimming.
Post and concrete foundations available upon request.